•Project Name: Metropolitan Area HSR (Suseo-Pyeongtaek) Section 6-1
•Location: From Osan-ri, Dongtan-myeon, Hwaseong, Gyeonggi Province
to Gohyeon-ri, Jinwi-myeon, Pyeongtaek, Gyeonggi Province
•Client: Korea Rail Network Authority
•Project Value: USD 90 million
•Project Period: January 3, 2012 – December 20, 2016 (60 months)
•Project Scope
- Tunnel (double-track railway): 5.67 km Section 14: 1.93 km)
- Vertical Shaft (Ventilation Shaft): 2 shafts (74 m and 47 m deep)
- Track (Track Concrete Layer): 5.67 km
•Location: From Osan-ri, Dongtan-myeon, Hwaseong, Gyeonggi Province
to Gohyeon-ri, Jinwi-myeon, Pyeongtaek, Gyeonggi Province
•Client: Korea Rail Network Authority
•Project Value: USD 90 million
•Project Period: January 3, 2012 – December 20, 2016 (60 months)
•Project Scope
- Tunnel (double-track railway): 5.67 km Section 14: 1.93 km)
- Vertical Shaft (Ventilation Shaft): 2 shafts (74 m and 47 m deep)
- Track (Track Concrete Layer): 5.67 km